Structuring Architect, Engineering, and Design Contracts: Limiting Risk, Liability and Defenses

A live 90-minute CLE webinar with interactive Q&A


Thursday, September 13, 2018

1:00pm-2:30pm EDT, 10:00am-11:30am PDT

or call 1-800-926-7926

This CLE webinar will provide counsel with a review of the scope of risks facing architects, engineers and construction design professionals, discuss recent trends and developments in theories of liability and defenses, and provide proactive approaches to minimize the risk of liability through effective contract provisions and project documentation.

Description

Innovations in project delivery models, including design, build, building information modeling (BIM), integrated project delivery (IPD), and green construction, present significant new challenges for design professionals and various pitfalls and potential claims.

Recent trends in the expansion of liability claims include an increase in fiduciary claims against architects and engineers. Claimants carefully parse the design professional’s engagement letter for language that may be used to imply a fiduciary relationship.

Generally, the economic loss rule precludes third-party tort claims against design professionals for defective design. However, the application of the economic loss doctrine to the construction arena is evolving, and court interpretation of the rule and its exceptions vary significantly from state to state.

Through careful contract drafting and negotiations, counsel can identify and minimize specific risks by clearly defining the scope of professional services, limiting liability to third parties, disclaiming warranties, requiring additional insured endorsements, and attempting to mitigate contract damages.

Listen as our authoritative panel of construction practitioners looks at the scope of risks facing architects, engineers and construction design professionals, and discusses recent case law developments in theories of liability and defenses. The panel will impart practical approaches to minimize the risk of liability through effective contract provisions and project documentation.

READ MORE

Outline

  1. Overview of the scope of risks in various project delivery methods
    1. Design/build
    2. BIM
    3. IPD
    4. Green/sustainable
  2. Theories of liability
    1. Contractual
    2. Tort
    3. Breach of fiduciary duties
    4. Third-party beneficiaries
    5. Trends in the expansion of liability
  3. Defenses
    1. Economic loss doctrine
    2. Statute of limitations/repose
    3. Comparative negligence
    4. Trends in liability defenses
  4. Minimizing risk through contractual and project documentation

Benefits

The panel will review these and other crucial issues:

  • How have project delivery models that integrate design professionals into the construction process impacted the scope of design professional liability?
  • What are case law developments resulting in a fiduciary duty obligation for design professionals?
  • How is the economic loss doctrine applied in the construction defect arena?
  • How can design liability for construction claims be minimized through strategic project documentation?

Faculty

Adelstein-David
David M. Adelstein

Partner
Kirwin Norris

Mr. Adelstein represents general contractors, subcontractors, design professionals, developers, associations,...  |  Read More

Broghammer, John
John D. Broghammer

Partner
Sims Lawrence & Arruti

Mr. Broghammer specializes in insurance coverage disputes and the representation of design professionals. His practice...  |  Read More

Live Webinar

Buy Live Webinar

Live Webinar

$297

Buy Live Webinar & Recording
A savings of $200

Live Webinar & Download

$394

Live Webinar & DVD

$394 + $9.45 S&H

Other Formats
— Anytime, Anywhere

Strafford will process CLE credit for one person on each recording. All formats include program handouts. To find out which recorded format will provide the best CLE option, select your state:

CLE On-Demand Video

48 hours after event

$297

Download

48 hours after event

$297

DVD

10 business days after event

$297 + $9.45 S&H